Hangar building #5, located at the main entrance to the Airport, is currently under extensive renovation and will be available for partial or entire-building leasing on June 1, 2025. It is approximately 9400sf, with 7,600sf of hangar space, 1,800sf of office space on the east side of the building facing the parking lot, and 2 restrooms. 1800sf of the 7600sf hangar space on the west side of the building could be converted to additional office or storage space. Recent renovations include a new roof, all new building sheeting and insulation, epoxy/paint floor in the hangar bay, painting of the structural steel and walls in the hangar bay, all new windows and doors, refurbished hangar doors on both the north and south side of the hangar bay, all new lighting, switches, and power outlets, all new dry wall, flooring, and HVAC in the office spaces, a new oil water separator connected to the sewer system for the floor drain in the hangar bay, new connection to water and sewer utility, new underground cable/internet service, and brand new asphalt ramp/taxiway surrounding the building.
Given the proximity of Hangar Building #5 to the new Main Entrance Hangars #38-40, the office and storage spaces and restrooms in Hangar Building #5 can be made available to service occupancy in Hangars #38-40 without having to build these amenities and take up space in Hangars #38-40.